57 Unique Roof Facets. One Unique Partnership.

Poor ventilation across the multi-faceted roof of the historic City Hall in Cuyahoga Falls, OH, meant that existing shingles were melting to the concrete deck below. To address this challenge, and also create a new modern aesthetic for the building, Garland Territory Manager Matt McGonigal recommended a switch to metal roofing. 

  • Location: Cuyahoga Falls, OH
  • Garland Territory Manager: Matt McGonigal
  • Contractor: Brookpark Design Builders
  • Materials Used: R-Mer Loc
Cuyahoga City Hall, located in Cuyahoga Falls, is one of Garland's latest projects to use our R-Mer Loc panels to fully restore its roof. This 38,000 square-foot project with 57 different roof facets was in dire need of restoration. Its original shingle roof was deteriorating as some shingles were cracking, blowing off, and melting to the concrete deck below. In this video, we run through how R-Mer Loc panels help restore this roof and give it a beautiful architecturally sound design.
Cuyahoga City Hall, located in Cuyahoga Falls, is one of Garland's latest projects to use our R-Mer Loc panels to fully restore its roof. This 38,000 square-foot project with 57 different roof facets was in dire need of restoration. Its original shingle roof was deteriorating as some shingles were cracking, blowing off, and melting to the concrete deck below. In this video, we run through how R-Mer Loc panels help restore this roof and give it a beautiful architecturally sound design.

"Everyone came together to produce a beautiful, long-lasting roof"

Local Garland representative Matt McGonigal worked with Cuyahoga Falls City Hall to develop solutions that wouldbest complement this project. Rather than replacing the existing shingle roof. McGonigal recommended Garland's R-Mer® Loc. This high-performance metal solution would prove more adaptable to the building's architecture, and installing hat channels and retrofitting panels would be less expensive than reinstalling shingles. 

McGonigal worked with Cuyahoga Falls Building and Grounds Superintendent John Ball and City Engineer Tony Demasi to ensure the project flowed smoothly. In addition to the roof slopes, the building also required all new gutters and and downspouts to be covered with metal, and about 5,000 square feet of flat roof. Capped flat stock metal was installed on the captivating entrances, and the building's two "gazebo roofs" required additional details. 

Cuyahoga City Hall, located in Cuyahoga Falls, is one of Garland's latest projects to use our R-Mer Loc panels to fully restore its roof. This 38,000 square-foot project with 57 different roof facets was in dire need of restoration. Its original shingle roof was deteriorating as some shingles were cracking, blowing off, and melting to the concrete deck below. In this video, we run through how R-Mer Loc panels help restore this roof and give it a beautiful architecturally sound design.

Attention to the Smallest Detail

McGonigal, Ball, and Demasi worked on the specifications package for about a month before bidding, with every piece of the roof requiring specialized attention to detail. Each every single screw hole was pre-drilled to accommodate the fasteners. Although it took longer, the attention to detail proved successful for the project. 

And even when problems arose, the team was resilient. They encountered an odd gutter near the building's clock tower that required a change to their original approach. But contracting company, Brookpark Design Builders of North Royalton, Ohio, adapted quickly. They tore out the existing gutter to make room for a custom gutter system made with flat stock metal, and progress continued. 

Cuyahoga Falls City Hall Cuyahoga, OH Project Highlight YT Thumbnail v1

See the Results

"Everyone came together to produce a beautiful and long-lasting roof," said McGonigal. "And we secured the project from beginning to end, providing a 30-year Garland warranty. I feel honored to add beauty to such a staple of the community." 

For Ball, partnering with Garland definitely contributed to the overall success of the project. "Matt made the process very easy for us. He was there from start to finish, offering step-by-step guidance as it was needed throughout the project. Greg and his crew were very professional and courteous of the day-to-day operations of City Hall. The product itself is simply amazing. I receive compliments on the building on an almost daily basis."